Wednesday
Jun042008

....

june4th.jpg

 

 

june4th2.jpg 

Monday
Jul072008

Alomost done....

Suspended%20before%20jig%20is%20cut%20away.jpg

 

Walls%20being%20built.jpg 

with%20walls.jpg 

another%20view.jpg 

 

blasted%20view%201.jpg
 

blasted%20view%202.jpg 

blasted%20view%203.jpg 

All that remains is for laquer to be applied. 

Friday
Jul112008

Installed, and very much near the end..

finished.jpg

finished%20view2.jpg 

finished%20view3.jpg 

on%20a%20palllete%20with%20wheels.jpg 

 

on%20the%20truck.jpg 

installing%20the%20speakers.jpg 

 

installed%20side%20view.jpg 

All that remains is to install the back sections which will (hopefully) cover these wires: 

 installed%20back%20view.jpg

Saturday
Jul122008

Fin!

finalsenners1.jpg

finalsenners2.jpg 

 

 

finalsenners5.jpg

finalsenners6.jpg 

finalsenners7.jpg 

finalsenners8.jpg 

The white cables in the back will be replaced with black ones to blend in better. 

Page 1 2